Project Overview
The 420,262-square-foot facility at 1180 Corporate Center Drive East will join Mapletree’s existing 1.3 million-square-foot warehouse in Tobyhanna, creating a powerful logistics campus with direct highway access.
Key Features:
- 40-foot clear ceiling heights
- 64 dock doors and trailer stalls
- 189 parking spaces
- LEED Silver certification targeted
- Delivery: Fall 2026
Why This Location Matters
The site offers immediate access to I-380 and quick connectivity to I-80, positioning it as an ideal hub for regional and national distribution networks serving the Northeast.
JLL is handling leasing, with Jeff Lockard leading marketing efforts.
Building Momentum
This groundbreaking marks Mapletree’s third project launch in under a month, following two Chicago-area developments totaling 461,406 square feet. The developer now controls:
- 2.5M SF across Pennsylvania
- 66M+ SF nationally
Kadean Construction is serving as general contractor on the Tobyhanna project.
The Bottom Line
With sustained demand for modern industrial space, Mapletree is betting on the Poconos as companies increasingly prioritize efficiency, sustainability, and strategic positioning in their logistics operations.
Originally Reported by Real Estate New Jersey.
